Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd
Agilent Production cell 6 fosters inefficient production practices, is outdated for its existing process, and lacking in product flow. A plant optimization is applied to bring order, efficiency, and optimize flow in the production lines. Deliverables include a proposed process and material flow that...
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English English English |
Published: |
2013
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/6547/ http://umpir.ump.edu.my/id/eprint/6547/ http://umpir.ump.edu.my/id/eprint/6547/1/CD7718.pdf http://umpir.ump.edu.my/id/eprint/6547/4/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%201.pdf http://umpir.ump.edu.my/id/eprint/6547/5/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%203.pdf |
id |
ump-6547 |
---|---|
recordtype |
eprints |
spelling |
ump-65472015-11-19T01:52:38Z http://umpir.ump.edu.my/id/eprint/6547/ Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd Nur Afiqah , Noor Azman TS Manufactures Agilent Production cell 6 fosters inefficient production practices, is outdated for its existing process, and lacking in product flow. A plant optimization is applied to bring order, efficiency, and optimize flow in the production lines. Deliverables include a proposed process and material flow that decreases product travel distances, cross flow and increases productivity as well as effectiveness of the proposed optimization analysis. Major modification of the cell decisions include downsizing the existing cell, sorting to find waste in material handling and establishing a clear process/product flows. The proposed plant optimization was analysis and results yield 100% productivity. The percentage efficiency of the optimize flow layout is 80% compared to 67% in existing flow layout. The analysis of efficiency has been increased to 13% in the proposed process flow. The product travel distance also has been reduced from 93 feet’s to 20 feet’s. 2013-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/6547/1/CD7718.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/6547/4/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%201.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/6547/5/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%203.pdf Nur Afiqah , Noor Azman (2013) Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd. Faculty of Manufacturing Engineering , Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:78153&theme=UMP2 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English English English |
topic |
TS Manufactures |
spellingShingle |
TS Manufactures Nur Afiqah , Noor Azman Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd |
description |
Agilent Production cell 6 fosters inefficient production practices, is outdated for its existing process, and lacking in product flow. A plant optimization is applied to bring order, efficiency, and optimize flow in the production lines. Deliverables include a proposed process and material flow that decreases product travel distances, cross flow and increases productivity as well as effectiveness of the proposed optimization analysis. Major modification of the cell decisions include downsizing the existing cell, sorting to find waste in material handling and establishing a clear process/product flows. The proposed plant optimization was analysis and results yield 100% productivity. The percentage efficiency of the optimize flow layout is 80% compared to 67% in existing flow layout. The analysis of efficiency has been increased to 13% in the proposed process flow. The product travel distance also has been reduced from 93 feet’s to 20 feet’s. |
format |
Undergraduates Project Papers |
author |
Nur Afiqah , Noor Azman |
author_facet |
Nur Afiqah , Noor Azman |
author_sort |
Nur Afiqah , Noor Azman |
title |
Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd |
title_short |
Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd |
title_full |
Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd |
title_fullStr |
Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd |
title_full_unstemmed |
Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd |
title_sort |
optimize flow layout and analysis of effectiveness at bi technologies corporation sdn. bhd |
publishDate |
2013 |
url |
http://umpir.ump.edu.my/id/eprint/6547/ http://umpir.ump.edu.my/id/eprint/6547/ http://umpir.ump.edu.my/id/eprint/6547/1/CD7718.pdf http://umpir.ump.edu.my/id/eprint/6547/4/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%201.pdf http://umpir.ump.edu.my/id/eprint/6547/5/NUR%20AFIQAH%20NOOR%20AZMAN%20%28CD7718%29%20-%20CHAP%203.pdf |
first_indexed |
2023-09-18T22:02:24Z |
last_indexed |
2023-09-18T22:02:24Z |
_version_ |
1777414485832630272 |