Scheduling Analysis for Job Sequencing in Veneer Lamination Line
The objective of this project is to reduce the numbers of work-in-process (WIP) at veneer lamination line One of the problems that been identified and formulated was poor production planning and scheduling at the veneer lamination line. Scheduling analysis of priority rules to overcome the poor plan...
Main Authors: | Mohamad Zairi, Baharom, Wan Nazdah, Wan Hussin |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/7334/ http://umpir.ump.edu.my/id/eprint/7334/1/Scheduling_Analysis_for_Job_Sequencing_in_Veneer_Lamination_Line.pdf |
Similar Items
-
Fuzzy Mixed Assembly Line Sequencing and Scheduling Optimization Model Using Multiobjective Dynamic Fuzzy GA
by: Zahari, Taha, et al.
Published: (2014) -
Multiobjective Fuzzy Mixed Assembly Line Sequencing Optimization Model
by: Tahriri, Farzad, et al.
Published: (2014) -
Experimental analysis on drilling process of composite laminates
by: Sivasankaran, Praveena Nair
Published: (2008) -
Stress analysis of thin-walled laminated composite beams
by: Mohamed Ali, Jaafar Syed, et al.
Published: (2015) -
Experimental analysis on drilling process of CFRP composite laminates
by: Latifah, Md Yusoff
Published: (2008)