Lead time reduction in SME by using value stream mapping (VSM) technique
This research is related to a study on lead time reduction in SME by using value stream mapping (VSM) technique. VSM was pioneered in the 1980s by Toyota’s chief engineer, Taiichi Ohno and sensei Shigeo Shingo. VSM is the tool or technique to identify the non-value added activities by eliminating it...
Similar Items
-
Value stream mapping: an important footstep for value analysis and value engineering
by: Karim, A.N. Mustafizul, et al.
Published: (2011) -
Productivity improvement using VSM at TT Electronis Sdn Bhd
by: Muhammad Najmi, Ahmat
Published: (2016) -
Improving productivity using value stream mapping (VSM) - a case study
by: Ahmad Nasser, Mohd Rose, et al.
Published: (2019) -
Value stream mapping – a tool to detect and reduce waste for a lean manufacturing system
by: Noraini, Mohd Razali, et al.
Published: (2020) -
Value stream mapping (VSM) of production line for a high volume manufacturing industry
by: A.N., Mustafizul Karim, et al.
Published: (2012)