Mathematical model to reduce the lead time at workstations

In the modern’s era, the efficiency in workstations assembly line (AL) of manufacturing industry is very crucial and important in dealing with the customers and market demand. In addition, the automotive industry is one of the most important industries in the world nowadays. The automotive manufactu...

Full description

Bibliographic Details
Main Author: Najib , Md Saad
Format: Undergraduates Project Papers
Language:English
Published: 2013
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/8728/
http://umpir.ump.edu.my/id/eprint/8728/
http://umpir.ump.edu.my/id/eprint/8728/1/CD8456%20%40%2049.pdf
id ump-8728
recordtype eprints
spelling ump-87282015-10-27T02:37:11Z http://umpir.ump.edu.my/id/eprint/8728/ Mathematical model to reduce the lead time at workstations Najib , Md Saad HD Industries. Land use. Labor HD28 Management. Industrial Management In the modern’s era, the efficiency in workstations assembly line (AL) of manufacturing industry is very crucial and important in dealing with the customers and market demand. In addition, the automotive industry is one of the most important industries in the world nowadays. The automotive manufacturing industries have many shops and workstations. Each workstation has a number of operations including tasks that delegated. The operations and task is depend on the assemble product on body car. One of these shops is Assembly line shop. The scope of this study is focusing on the Assembly Line Shop (ALS) in the Automotive Assembly Line. The problems that occur in the assembly line shop concern queuing and idle time that will directly affect to the lead time between workstations. In this study, it discusses about to minimize the lead time at assembly line and to maximize the process time at workstations by using mathematical model. A mathematical model was applied to maximize the process time all operations in all workstations at the same time and to reduce the lead time in transferring the car structure and part between stations during assemble. The result showed that saving time and ensuring maximum production can increase profits in the automobile manufacturing industry. The time frame covered is one year it is in the year of 2013. This study is conducted by using the mathematical model and using MATLAB software to solve it. 2013-12 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/8728/1/CD8456%20%40%2049.pdf Najib , Md Saad (2013) Mathematical model to reduce the lead time at workstations. Faculty of Industrial Management, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:83139&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic HD Industries. Land use. Labor
HD28 Management. Industrial Management
spellingShingle HD Industries. Land use. Labor
HD28 Management. Industrial Management
Najib , Md Saad
Mathematical model to reduce the lead time at workstations
description In the modern’s era, the efficiency in workstations assembly line (AL) of manufacturing industry is very crucial and important in dealing with the customers and market demand. In addition, the automotive industry is one of the most important industries in the world nowadays. The automotive manufacturing industries have many shops and workstations. Each workstation has a number of operations including tasks that delegated. The operations and task is depend on the assemble product on body car. One of these shops is Assembly line shop. The scope of this study is focusing on the Assembly Line Shop (ALS) in the Automotive Assembly Line. The problems that occur in the assembly line shop concern queuing and idle time that will directly affect to the lead time between workstations. In this study, it discusses about to minimize the lead time at assembly line and to maximize the process time at workstations by using mathematical model. A mathematical model was applied to maximize the process time all operations in all workstations at the same time and to reduce the lead time in transferring the car structure and part between stations during assemble. The result showed that saving time and ensuring maximum production can increase profits in the automobile manufacturing industry. The time frame covered is one year it is in the year of 2013. This study is conducted by using the mathematical model and using MATLAB software to solve it.
format Undergraduates Project Papers
author Najib , Md Saad
author_facet Najib , Md Saad
author_sort Najib , Md Saad
title Mathematical model to reduce the lead time at workstations
title_short Mathematical model to reduce the lead time at workstations
title_full Mathematical model to reduce the lead time at workstations
title_fullStr Mathematical model to reduce the lead time at workstations
title_full_unstemmed Mathematical model to reduce the lead time at workstations
title_sort mathematical model to reduce the lead time at workstations
publishDate 2013
url http://umpir.ump.edu.my/id/eprint/8728/
http://umpir.ump.edu.my/id/eprint/8728/
http://umpir.ump.edu.my/id/eprint/8728/1/CD8456%20%40%2049.pdf
first_indexed 2023-09-18T22:06:36Z
last_indexed 2023-09-18T22:06:36Z
_version_ 1777414750227922944