Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique
This paper proposes a conceptual framework for owner- contractor relationship and time–cost trade-off analysis of construction project control system using fuzzy logic approach. Construction projects require a well-defined starting point and well-defined finish point with accurate resource allocat...
| Main Authors: | , , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English English |
| Published: |
Institute of Electrical and Electronics Engineers Inc.
2015
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/42771/ http://irep.iium.edu.my/42771/ http://irep.iium.edu.my/42771/ http://irep.iium.edu.my/42771/1/42771.pdf http://irep.iium.edu.my/42771/4/42771_Modeling%20a%20conceptual%20framework.SCOPUS.pdf |