Some greedy based algorithms for multi periods degree constrained minimum spanning tree problem
In Indonesia, the fund for a project or an activity is usually divided into terms which can be two or three terms. Therefore, in order to optimize the utility, the team of the project need to design the project so that the project can be used as soon as possible without violating the restriction giv...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Asian Research Publishing Network (ARPN)
2015
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/46124/ http://irep.iium.edu.my/46124/ http://irep.iium.edu.my/46124/1/Wamiliana_ARPN_November_2015.pdf |