Uncertainty and Climate Variability in the Design and Operation of Water Resources Projects : Examples and Case Studies
There are two common problems in flood hydrology: 1) estimate the return period for a given flood; and 2) estimate the flood for a given return period. A commonly used procedure to solve these problems is to fit a probability density function such...
Main Authors: | , |
---|---|
Format: | Other Environmental Study |
Language: | English en_US |
Published: |
World Bank, Washington, DC
2013
|
Subjects: | |
Online Access: | http://documents.worldbank.org/curated/en/2011/11/17837367/uncertainty-climate-variability-design-operation-water-resources-projects-examples-case-studies-vol-1-2-annexes http://hdl.handle.net/10986/15813 |