Road Projects Cost Benefit Analysis : Scenario Analysis of the Effect of Varying Inputs

Six projects from six countries were selected as the cases for detailed analysis in this study. They are from Argentina, Botswana, India, Kenya, Lao PDR and Paraguay, representing a wide range of geographical distribution. Also, the extent of the e...

Full description

Bibliographic Details
Main Author: Tsunokawa, Koji
Format: Working Paper
Language:English
en_US
Published: World Bank, Washington, DC 2017
Subjects:
FOG
Online Access:http://documents.worldbank.org/curated/en/259161468327409408/Road-projects-cost-benefit-analysis-scenario-analysis-of-the-effect-of-varying-inputs
http://hdl.handle.net/10986/27814
id okr-10986-27814
recordtype oai_dc
repository_type Digital Repository
institution_category Foreign Institution
institution Digital Repositories
building World Bank Open Knowledge Repository
collection World Bank
language English
en_US
topic ABBREVIATIONS
ACCIDENT
ACCIDENT COSTS
ANALYSIS PERIOD
ASPHALT
ASPHALT PAVEMENT
AVERAGE SPEEDS
AVERAGE TRAFFIC GROWTH
BYPASSES
CARGO
CARRIAGEWAY
CIVIL WORKS
CLASSIFICATION
CONCRETE
CONCRETE PAVEMENT
CONCRETE PAVEMENTS
CONTENTS
CORRIDOR
CORRIDOR TRANSPORT
CORRIDOR TRANSPORT IMPROVEMENT
CORRIDOR TRANSPORT IMPROVEMENT PROJECT
COST BENEFIT ANALYSIS
CRACKING
DESCRIPTION
DIESEL
DOCUMENTS
FLEXIBLE PAVEMENTS
FOG
FRAMEWORK
FUEL
FUEL PRICE
FUEL PRICES
GENERATED TRAFFIC
GOAL
GRADING
GRAVEL
GRAVEL RESURFACING
HEADING
HIGHWAY
HIGHWAY IMPROVEMENT
HIGHWAY IMPROVEMENT PROJECT
INDICES
INTERNAL RATE OF RETURN
INTERNATIONAL ROUGHNESS INDEX
LANE ROAD
LANES
LENGTH OF ROAD
LOADING
MAINTENANCE LABOR
NET PRESENT VALUE
NORMAL TRAFFIC
OVERLAY
PASSENGER
PASSENGER WORKING TIME
PASSENGERS
PAVED ROADS
PAVEMENT CONDITION
PAVEMENT CONSTRUCTION
PAVEMENT WIDTH
PERIODIC MAINTENANCE
POTHOLES
RANGE
REDUCTION IN TRAFFIC
REPAIR
ROAD
ROAD CONDITIONS
ROAD DETERIORATION
ROAD INFRASTRUCTURE
ROAD INVESTMENT
ROAD INVESTMENTS
ROAD MAINTENANCE
ROAD MANAGEMENT
ROAD NETWORK
ROAD PROJECTS
ROAD REHABILITATION
ROAD SECTOR
ROAD USER
ROAD USER COSTS
ROADS
ROADWAY
ROUGHNESS
ROUTINE MAINTENANCE
SIGNS
SPEED
STATE HIGHWAY
STATE HIGHWAY IMPROVEMENT
STRENGTH
TRAFFIC
TRAFFIC DEMAND
TRAFFIC GROWTH
TRAFFIC REDUCTION
TRAFFIC VOLUME
TRAFFIC VOLUMES
TRANSPORT
TRANSPORT IMPROVEMENT
TRANSPORT RESEARCH
TRANSPORT SECTOR
TRAVEL TIME
TRUE
UNPAVED ROADS
VALUE OF TIME
VEHICLE
VEHICLE FLEET
VEHICLE OPERATING
VEHICLE OPERATING COST
VEHICLE OPERATION
VEHICLE PRICE
VEHICLE SPEEDS
VEHICLE TYPES
VEHICLES
WORKING VALUE
spellingShingle ABBREVIATIONS
ACCIDENT
ACCIDENT COSTS
ANALYSIS PERIOD
ASPHALT
ASPHALT PAVEMENT
AVERAGE SPEEDS
AVERAGE TRAFFIC GROWTH
BYPASSES
CARGO
CARRIAGEWAY
CIVIL WORKS
CLASSIFICATION
CONCRETE
CONCRETE PAVEMENT
CONCRETE PAVEMENTS
CONTENTS
CORRIDOR
CORRIDOR TRANSPORT
CORRIDOR TRANSPORT IMPROVEMENT
CORRIDOR TRANSPORT IMPROVEMENT PROJECT
COST BENEFIT ANALYSIS
CRACKING
DESCRIPTION
DIESEL
DOCUMENTS
FLEXIBLE PAVEMENTS
FOG
FRAMEWORK
FUEL
FUEL PRICE
FUEL PRICES
GENERATED TRAFFIC
GOAL
GRADING
GRAVEL
GRAVEL RESURFACING
HEADING
HIGHWAY
HIGHWAY IMPROVEMENT
HIGHWAY IMPROVEMENT PROJECT
INDICES
INTERNAL RATE OF RETURN
INTERNATIONAL ROUGHNESS INDEX
LANE ROAD
LANES
LENGTH OF ROAD
LOADING
MAINTENANCE LABOR
NET PRESENT VALUE
NORMAL TRAFFIC
OVERLAY
PASSENGER
PASSENGER WORKING TIME
PASSENGERS
PAVED ROADS
PAVEMENT CONDITION
PAVEMENT CONSTRUCTION
PAVEMENT WIDTH
PERIODIC MAINTENANCE
POTHOLES
RANGE
REDUCTION IN TRAFFIC
REPAIR
ROAD
ROAD CONDITIONS
ROAD DETERIORATION
ROAD INFRASTRUCTURE
ROAD INVESTMENT
ROAD INVESTMENTS
ROAD MAINTENANCE
ROAD MANAGEMENT
ROAD NETWORK
ROAD PROJECTS
ROAD REHABILITATION
ROAD SECTOR
ROAD USER
ROAD USER COSTS
ROADS
ROADWAY
ROUGHNESS
ROUTINE MAINTENANCE
SIGNS
SPEED
STATE HIGHWAY
STATE HIGHWAY IMPROVEMENT
STRENGTH
TRAFFIC
TRAFFIC DEMAND
TRAFFIC GROWTH
TRAFFIC REDUCTION
TRAFFIC VOLUME
TRAFFIC VOLUMES
TRANSPORT
TRANSPORT IMPROVEMENT
TRANSPORT RESEARCH
TRANSPORT SECTOR
TRAVEL TIME
TRUE
UNPAVED ROADS
VALUE OF TIME
VEHICLE
VEHICLE FLEET
VEHICLE OPERATING
VEHICLE OPERATING COST
VEHICLE OPERATION
VEHICLE PRICE
VEHICLE SPEEDS
VEHICLE TYPES
VEHICLES
WORKING VALUE
Tsunokawa, Koji
Road Projects Cost Benefit Analysis : Scenario Analysis of the Effect of Varying Inputs
geographic_facet Argentina
Botswana
India
Kenya
Lao People's Democratic Republic
Paraguay
description Six projects from six countries were selected as the cases for detailed analysis in this study. They are from Argentina, Botswana, India, Kenya, Lao PDR and Paraguay, representing a wide range of geographical distribution. Also, the extent of the effect of economic downturn which these countries experienced ranges a wide variety. In an economic downturn, uncertainties increase with many inputs of road projects Cost Benefit Analysis (CBA), including fuel prices, levels of demand, investment costs and maintenance availability. Also, important parameters of project evaluation such as discount rate and value of time need to be more carefully scrutinized. Therefore, it is very important for the developing countries to have good understanding about the effects of the variability of these inputs/parameters on project viability and the ranking of road investments. It is a role of the developing agencies to conduct a systematic analysis of these effects and disseminate the findings and knowledge obtained. The objective of the study is to obtain insights regarding the effects of varying inputs and parameters on the viability of road projects through case studies using Highway Development and Management Model (HDM-4), thereby to facilitate the formulation and implementation of road projects that increase the welfare of the society under the environment of increased uncertainty in an economic downturn. The results of the study will be summarized in a transport note as a discrete knowledge product and disseminated among various stakeholders including developing agencies staff, government officials and donor communities. To assess the effects of increased uncertainty with inputs of cost benefit analysis on the economic viability of road projects, this study first investigated the range of variability of the inputs for the six selected projects/countries. It was found that the variability ranges differ by country reflecting the degree of decrease in transport demand and relative change in factor prices due to economic downturn.
format Working Paper
author Tsunokawa, Koji
author_facet Tsunokawa, Koji
author_sort Tsunokawa, Koji
title Road Projects Cost Benefit Analysis : Scenario Analysis of the Effect of Varying Inputs
title_short Road Projects Cost Benefit Analysis : Scenario Analysis of the Effect of Varying Inputs
title_full Road Projects Cost Benefit Analysis : Scenario Analysis of the Effect of Varying Inputs
title_fullStr Road Projects Cost Benefit Analysis : Scenario Analysis of the Effect of Varying Inputs
title_full_unstemmed Road Projects Cost Benefit Analysis : Scenario Analysis of the Effect of Varying Inputs
title_sort road projects cost benefit analysis : scenario analysis of the effect of varying inputs
publisher World Bank, Washington, DC
publishDate 2017
url http://documents.worldbank.org/curated/en/259161468327409408/Road-projects-cost-benefit-analysis-scenario-analysis-of-the-effect-of-varying-inputs
http://hdl.handle.net/10986/27814
_version_ 1764465144317870080
spelling okr-10986-278142021-04-23T14:04:44Z Road Projects Cost Benefit Analysis : Scenario Analysis of the Effect of Varying Inputs Tsunokawa, Koji ABBREVIATIONS ACCIDENT ACCIDENT COSTS ANALYSIS PERIOD ASPHALT ASPHALT PAVEMENT AVERAGE SPEEDS AVERAGE TRAFFIC GROWTH BYPASSES CARGO CARRIAGEWAY CIVIL WORKS CLASSIFICATION CONCRETE CONCRETE PAVEMENT CONCRETE PAVEMENTS CONTENTS CORRIDOR CORRIDOR TRANSPORT CORRIDOR TRANSPORT IMPROVEMENT CORRIDOR TRANSPORT IMPROVEMENT PROJECT COST BENEFIT ANALYSIS CRACKING DESCRIPTION DIESEL DOCUMENTS FLEXIBLE PAVEMENTS FOG FRAMEWORK FUEL FUEL PRICE FUEL PRICES GENERATED TRAFFIC GOAL GRADING GRAVEL GRAVEL RESURFACING HEADING HIGHWAY HIGHWAY IMPROVEMENT HIGHWAY IMPROVEMENT PROJECT INDICES INTERNAL RATE OF RETURN INTERNATIONAL ROUGHNESS INDEX LANE ROAD LANES LENGTH OF ROAD LOADING MAINTENANCE LABOR NET PRESENT VALUE NORMAL TRAFFIC OVERLAY PASSENGER PASSENGER WORKING TIME PASSENGERS PAVED ROADS PAVEMENT CONDITION PAVEMENT CONSTRUCTION PAVEMENT WIDTH PERIODIC MAINTENANCE POTHOLES RANGE REDUCTION IN TRAFFIC REPAIR ROAD ROAD CONDITIONS ROAD DETERIORATION ROAD INFRASTRUCTURE ROAD INVESTMENT ROAD INVESTMENTS ROAD MAINTENANCE ROAD MANAGEMENT ROAD NETWORK ROAD PROJECTS ROAD REHABILITATION ROAD SECTOR ROAD USER ROAD USER COSTS ROADS ROADWAY ROUGHNESS ROUTINE MAINTENANCE SIGNS SPEED STATE HIGHWAY STATE HIGHWAY IMPROVEMENT STRENGTH TRAFFIC TRAFFIC DEMAND TRAFFIC GROWTH TRAFFIC REDUCTION TRAFFIC VOLUME TRAFFIC VOLUMES TRANSPORT TRANSPORT IMPROVEMENT TRANSPORT RESEARCH TRANSPORT SECTOR TRAVEL TIME TRUE UNPAVED ROADS VALUE OF TIME VEHICLE VEHICLE FLEET VEHICLE OPERATING VEHICLE OPERATING COST VEHICLE OPERATION VEHICLE PRICE VEHICLE SPEEDS VEHICLE TYPES VEHICLES WORKING VALUE Six projects from six countries were selected as the cases for detailed analysis in this study. They are from Argentina, Botswana, India, Kenya, Lao PDR and Paraguay, representing a wide range of geographical distribution. Also, the extent of the effect of economic downturn which these countries experienced ranges a wide variety. In an economic downturn, uncertainties increase with many inputs of road projects Cost Benefit Analysis (CBA), including fuel prices, levels of demand, investment costs and maintenance availability. Also, important parameters of project evaluation such as discount rate and value of time need to be more carefully scrutinized. Therefore, it is very important for the developing countries to have good understanding about the effects of the variability of these inputs/parameters on project viability and the ranking of road investments. It is a role of the developing agencies to conduct a systematic analysis of these effects and disseminate the findings and knowledge obtained. The objective of the study is to obtain insights regarding the effects of varying inputs and parameters on the viability of road projects through case studies using Highway Development and Management Model (HDM-4), thereby to facilitate the formulation and implementation of road projects that increase the welfare of the society under the environment of increased uncertainty in an economic downturn. The results of the study will be summarized in a transport note as a discrete knowledge product and disseminated among various stakeholders including developing agencies staff, government officials and donor communities. To assess the effects of increased uncertainty with inputs of cost benefit analysis on the economic viability of road projects, this study first investigated the range of variability of the inputs for the six selected projects/countries. It was found that the variability ranges differ by country reflecting the degree of decrease in transport demand and relative change in factor prices due to economic downturn. 2017-08-15T14:53:46Z 2017-08-15T14:53:46Z 2010 Working Paper http://documents.worldbank.org/curated/en/259161468327409408/Road-projects-cost-benefit-analysis-scenario-analysis-of-the-effect-of-varying-inputs http://hdl.handle.net/10986/27814 English en_US CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo World Bank World Bank, Washington, DC Publications & Research :: Working Paper Publications & Research Argentina Botswana India Kenya Lao People's Democratic Republic Paraguay