Relationship between project liability period and project quality / Nor Akmal Tarmizi
The topic will discuss about the relationship between defects liability period and project quality after completion. The objectives of this topic are to study the sufficiency and the defect liability period in relations to the project quality. Developers want to avoid a long defect liability peri...
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Civil Engineering
2006
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/21652/ http://ir.uitm.edu.my/id/eprint/21652/1/PPb_NOR%20AKMAL%20TARMIZI%20EC%20P%2006_5.pdf |