Relationship between project liability period and project quality / Nor Akmal Tarmizi
The topic will discuss about the relationship between defects liability period and project quality after completion. The objectives of this topic are to study the sufficiency and the defect liability period in relations to the project quality. Developers want to avoid a long defect liability peri...
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Civil Engineering
2006
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/21652/ http://ir.uitm.edu.my/id/eprint/21652/1/PPb_NOR%20AKMAL%20TARMIZI%20EC%20P%2006_5.pdf |
id |
uitm-21652 |
---|---|
recordtype |
eprints |
spelling |
uitm-216522018-10-23T04:40:37Z http://ir.uitm.edu.my/id/eprint/21652/ Relationship between project liability period and project quality / Nor Akmal Tarmizi Tarmizi, Nor Akmal Industrial engineering. Management engineering The topic will discuss about the relationship between defects liability period and project quality after completion. The objectives of this topic are to study the sufficiency and the defect liability period in relations to the project quality. Developers want to avoid a long defect liability periods in order to avoid the further liability on the project defects. As an example, in Malaysia, normally people will buy house before it is completed while in another country people will normally buy a completed house. Some developers will construct a project without really taking into consideration the project quality after completion. Many construction companies in Malaysia are not certified to ISO quality standard. Therefore, many projects are completed without fully complying with the required specifications and standards. This is not a good phenomenon in the nation construction industry. The result of this project show there is a relationship between project liability period and project quality. When defects liability period increase, the total defect will decrease. That is mean more total defect will give lower project quality. Defects liability period must amendment to suitable period to get better project quality. Faculty of Civil Engineering 2006-04 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/21652/1/PPb_NOR%20AKMAL%20TARMIZI%20EC%20P%2006_5.pdf Tarmizi, Nor Akmal (2006) Relationship between project liability period and project quality / Nor Akmal Tarmizi. [Student Project] (Submitted) |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Teknologi MARA |
building |
UiTM Institutional Repository |
collection |
Online Access |
language |
English |
topic |
Industrial engineering. Management engineering |
spellingShingle |
Industrial engineering. Management engineering Tarmizi, Nor Akmal Relationship between project liability period and project quality / Nor Akmal Tarmizi |
description |
The topic will discuss about the relationship between defects liability period and
project quality after completion. The objectives of this topic are to study the
sufficiency and the defect liability period in relations to the project quality.
Developers want to avoid a long defect liability periods in order to avoid the further
liability on the project defects. As an example, in Malaysia, normally people will buy
house before it is completed while in another country people will normally buy a
completed house. Some developers will construct a project without really taking into
consideration the project quality after completion. Many construction companies in
Malaysia are not certified to ISO quality standard. Therefore, many projects are
completed without fully complying with the required specifications and standards.
This is not a good phenomenon in the nation construction industry. The result of this
project show there is a relationship between project liability period and project
quality. When defects liability period increase, the total defect will decrease. That is
mean more total defect will give lower project quality. Defects liability period must
amendment to suitable period to get better project quality. |
format |
Student Project |
author |
Tarmizi, Nor Akmal |
author_facet |
Tarmizi, Nor Akmal |
author_sort |
Tarmizi, Nor Akmal |
title |
Relationship between project liability period and project quality / Nor Akmal Tarmizi |
title_short |
Relationship between project liability period and project quality / Nor Akmal Tarmizi |
title_full |
Relationship between project liability period and project quality / Nor Akmal Tarmizi |
title_fullStr |
Relationship between project liability period and project quality / Nor Akmal Tarmizi |
title_full_unstemmed |
Relationship between project liability period and project quality / Nor Akmal Tarmizi |
title_sort |
relationship between project liability period and project quality / nor akmal tarmizi |
publisher |
Faculty of Civil Engineering |
publishDate |
2006 |
url |
http://ir.uitm.edu.my/id/eprint/21652/ http://ir.uitm.edu.my/id/eprint/21652/1/PPb_NOR%20AKMAL%20TARMIZI%20EC%20P%2006_5.pdf |
first_indexed |
2023-09-18T23:07:02Z |
last_indexed |
2023-09-18T23:07:02Z |
_version_ |
1777418551975477248 |