A strategy for labor performance improvement for floor tiling work in single storey buildings in Abuja, Nigeria
This paper examined labor productivity of floor tiling works in selected construction sites. Sixty one (61) sites were visited for the purpose of collecting data. The construction sites chosen for this study were ongoing one storey buildings in Abuja, Nigeria. Data used for the study were obtained...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UKM
2015
|
Online Access: | http://journalarticle.ukm.my/9120/ http://journalarticle.ukm.my/9120/ http://journalarticle.ukm.my/9120/1/124-465-1-PB.pdf |