Skip to content
VuFind
Advanced
  • A study on the causes of desig...
  • Cite this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Permanent link
A study on the causes of design changes effecting the construction project performance

A study on the causes of design changes effecting the construction project performance

Although many project time delays, cost overruns and quality defects particularly in the construction sector are attributed to design changes, the associated issues have not yet been thoroughly investigated. This relatively of this study is to study the causes of design changes effecting the perform...

Full description

Bibliographic Details
Main Author: Nur Arfahanem, Mohamad Umpandi
Format: Undergraduates Project Papers
Language:English
English
English
Published: 2016
Subjects:
TA Engineering (General). Civil engineering (General)
Online Access:http://umpir.ump.edu.my/id/eprint/15889/
http://umpir.ump.edu.my/id/eprint/15889/
http://umpir.ump.edu.my/id/eprint/15889/1/A%20study%20on%20the%20causes%20of%20design%20changes%20effecting%20the%20construction%20project%20performance%20-Table%20of%20content-FKASA-NUR%20ARFAHANEM%20BT%20MOHAMAD%20UMPANDI-CD10169.pdf
http://umpir.ump.edu.my/id/eprint/15889/2/A%20study%20on%20the%20causes%20of%20design%20changes%20effecting%20the%20construction%20project%20performance%20-Abstract-FKASA-NUR%20ARFAHANEM%20BT%20MOHAMAD%20UMPANDI-CD10169.pdf
http://umpir.ump.edu.my/id/eprint/15889/3/A%20study%20on%20the%20causes%20of%20design%20changes%20effecting%20the%20construction%20project%20performance%20-Chapter%201-FKASA-NUR%20ARFAHANEM%20BT%20MOHAMAD%20UMPANDI-CD10169.pdf
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://umpir.ump.edu.my/id/eprint/15889/
http://umpir.ump.edu.my/id/eprint/15889/
http://umpir.ump.edu.my/id/eprint/15889/1/A%20study%20on%20the%20causes%20of%20design%20changes%20effecting%20the%20construction%20project%20performance%20-Table%20of%20content-FKASA-NUR%20ARFAHANEM%20BT%20MOHAMAD%20UMPANDI-CD10169.pdf
http://umpir.ump.edu.my/id/eprint/15889/2/A%20study%20on%20the%20causes%20of%20design%20changes%20effecting%20the%20construction%20project%20performance%20-Abstract-FKASA-NUR%20ARFAHANEM%20BT%20MOHAMAD%20UMPANDI-CD10169.pdf
http://umpir.ump.edu.my/id/eprint/15889/3/A%20study%20on%20the%20causes%20of%20design%20changes%20effecting%20the%20construction%20project%20performance%20-Chapter%201-FKASA-NUR%20ARFAHANEM%20BT%20MOHAMAD%20UMPANDI-CD10169.pdf

Similar Items

  • Causes and effects of delay in the construction project
    by: Nurshapika Adila, Adnan
    Published: (2018)
  • Variation Orders Causes in Construction Buildings Projects in Jordan
    by: Albtoosh, Ja’far A. Aldibat, et al.
    Published: (2017)
  • A review on causes of cost overrun in the construction projects
    by: A. M., Faten Albtoush, et al.
    Published: (2019)
  • A review on causes of cost overrun in the construction projects
    by: Albtoush, Faten Ahmad, et al.
    Published: (2019)
  • The study on cause and effect of abandoned housing project in selangor
    by: Nur Farhayu, Ariffin, et al.
    Published: (2018)

Search Options

  • Advanced Search

Find More

  • Browse the Catalog

Need Help?

  • Search Tips
Cannot write session to /tmp/vufind_sessions/sess_d6kutknlgp49bcdq0glp7hle5j