Series division method based on PSO and FA to optimize Long-Term Hydro Generation Scheduling
The fundamental requirement of power system hydro scheduling is to determine the optimal amount of generated powers for the hydro unit of the system in the scheduling horizon of 1 year or few years while satisfying the constraints of the hydroelectric system. Long-Term Hydro Generation Scheduling...
Main Authors: | Hammid, Ali Thaeer, M. H., Sulaiman |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2018
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/23313/ http://umpir.ump.edu.my/id/eprint/23313/ http://umpir.ump.edu.my/id/eprint/23313/ http://umpir.ump.edu.my/id/eprint/23313/1/Series%20division%20method%20based%20on%20PSO%20and%20FA%20to%20optimize.pdf |
Similar Items
-
Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
by: Hammid, Ali Thaeer, et al.
Published: (2017) -
Optimization and control of hydro generation scheduling using hybrid firefly algorithm and particle swarm optimization techniques
by: Hammid, Ali Thaeer
Published: (2018) -
Packet scheduling algorithms for long term evolution
by: Mohd. Ramli, Huda Adibah, et al.
Published: (2011) -
Optimum Power Production of Small Hydropower Plant (SHP) Using Firefly Algorithm (FA) in Himreen Lake Dam (HLD), Eastern Iraq
by: Hammid, Ali Thaeer, et al.
Published: (2017) -
Application of PSO technique for optimal locaton of FACTS devices
by: Suhairah, Razali
Published: (2009)