Skip to content
VuFind
Advanced
  • Work process in building const...
  • Cite this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Permanent link
Work process in building construction : a case study of Kelantan Trade Center (KTC)

Work process in building construction : a case study of Kelantan Trade Center (KTC)

In any construction industry, the work processes are very important in building construction. This is basic knowledge for implementation of construction. Each element of structure member has their advantage and disadvantage base on the need and the several of design for each building element. The in...

Full description

Bibliographic Details
Main Author: Mohd Afnan, Abdullah
Format: Undergraduates Project Papers
Language:English
English
English
English
Published: 2006
Subjects:
TH Building construction
Online Access:http://umpir.ump.edu.my/id/eprint/24666/
http://umpir.ump.edu.my/id/eprint/24666/
http://umpir.ump.edu.my/id/eprint/24666/1/Work%20process%20in%20building%20construction%20-%20a%20case%20study%20of%20Kelantan%20Trade%20Center%20%28KTC%29%20-%20Table%20of%20contents.pdf
http://umpir.ump.edu.my/id/eprint/24666/2/Work%20process%20in%20building%20construction%20-%20a%20case%20study%20of%20Kelantan%20Trade%20Center%20%28KTC%29%20-%20Abstract.pdf
http://umpir.ump.edu.my/id/eprint/24666/3/Work%20process%20in%20building%20construction%20-%20a%20case%20study%20of%20Kelantan%20Trade%20Center%20%28KTC%29%20-%20Chapter%201.pdf
http://umpir.ump.edu.my/id/eprint/24666/4/Work%20process%20in%20building%20construction%20-%20a%20case%20study%20of%20Kelantan%20Trade%20Center%20%28KTC%29%20-%20References.pdf
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://umpir.ump.edu.my/id/eprint/24666/
http://umpir.ump.edu.my/id/eprint/24666/
http://umpir.ump.edu.my/id/eprint/24666/1/Work%20process%20in%20building%20construction%20-%20a%20case%20study%20of%20Kelantan%20Trade%20Center%20%28KTC%29%20-%20Table%20of%20contents.pdf
http://umpir.ump.edu.my/id/eprint/24666/2/Work%20process%20in%20building%20construction%20-%20a%20case%20study%20of%20Kelantan%20Trade%20Center%20%28KTC%29%20-%20Abstract.pdf
http://umpir.ump.edu.my/id/eprint/24666/3/Work%20process%20in%20building%20construction%20-%20a%20case%20study%20of%20Kelantan%20Trade%20Center%20%28KTC%29%20-%20Chapter%201.pdf
http://umpir.ump.edu.my/id/eprint/24666/4/Work%20process%20in%20building%20construction%20-%20a%20case%20study%20of%20Kelantan%20Trade%20Center%20%28KTC%29%20-%20References.pdf

Similar Items

  • Efficiency in construction process
    by: Muhammad Muslim , Ramle
    Published: (2012)
  • A study on impact of employee training on project performance in construction industry in Kota Bharu, Kelantan
    by: Nik Alia Haifaa , Nik Adik
    Published: (2014)
  • Study on building information modeling (BIM) process flow in construction industry: a model exploratory approach to research
    by: Nurulashikin, Daud
    Published: (2014)
  • Interior design and construction project management: performance and productivity in Malaysian building industry
    by: Jasmani, Ismail
    Published: (2016)
  • Construction quality of school buildings using the Industrialised Building System (IBS)
    by: Ali, Maisarah, et al.
    Published: (2012)

Search Options

  • Advanced Search

Find More

  • Browse the Catalog

Need Help?

  • Search Tips
Cannot write session to /tmp/vufind_sessions/sess_otti0iibah0hcqmrd0ne6foi4p