Optimization of Assembly Line Balancing with Resource Constraint using NSGA-II: A Case Study
Assembly line balancing type-e problem with resource constraint (ALBE-RC) is an attempt to assign the tasks to a minimal number of workstation with minimum cycle time by considering the resource constraint. Due to rapid growth in manufacturing and limited number of resources in industry, all the tas...
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | English English English |
| Published: |
Research India Publications
2016
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/8243/ http://umpir.ump.edu.my/id/eprint/8243/ http://umpir.ump.edu.my/id/eprint/8243/ http://umpir.ump.edu.my/id/eprint/8243/1/Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource%20Constraint%20using%20NSGA-II-%20A%20Case%20Study.pdf http://umpir.ump.edu.my/id/eprint/8243/7/c-f158.pdf http://umpir.ump.edu.my/id/eprint/8243/13/fist-2017-mashitah-%20Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource.pdf |
Internet
http://umpir.ump.edu.my/id/eprint/8243/http://umpir.ump.edu.my/id/eprint/8243/
http://umpir.ump.edu.my/id/eprint/8243/
http://umpir.ump.edu.my/id/eprint/8243/1/Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource%20Constraint%20using%20NSGA-II-%20A%20Case%20Study.pdf
http://umpir.ump.edu.my/id/eprint/8243/7/c-f158.pdf
http://umpir.ump.edu.my/id/eprint/8243/13/fist-2017-mashitah-%20Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource.pdf