Optimization of Assembly Line Balancing with Resource Constraint using NSGA-II: A Case Study
Assembly line balancing type-e problem with resource constraint (ALBE-RC) is an attempt to assign the tasks to a minimal number of workstation with minimum cycle time by considering the resource constraint. Due to rapid growth in manufacturing and limited number of resources in industry, all the tas...
| Main Authors: | Masitah, Jusop, M. F. F., Ab Rashid |
|---|---|
| Format: | Article |
| Language: | English English English |
| Published: |
Research India Publications
2016
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/8243/ http://umpir.ump.edu.my/id/eprint/8243/ http://umpir.ump.edu.my/id/eprint/8243/ http://umpir.ump.edu.my/id/eprint/8243/1/Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource%20Constraint%20using%20NSGA-II-%20A%20Case%20Study.pdf http://umpir.ump.edu.my/id/eprint/8243/7/c-f158.pdf http://umpir.ump.edu.my/id/eprint/8243/13/fist-2017-mashitah-%20Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource.pdf |
Similar Items
-
Optimisation of Assembly Line Balancing Type-E with Resource Constraints using NSGA-II
by: Masitah, Jusop, et al.
Published: (2016) -
Multi-objective optimisation of assembly line balancing type-e problem with resource constraints
by: Masitah, Jusop
Published: (2016) -
Optimization of mixed-model assembly line balancing problem with resource constraints
by: M. M., Razali, et al.
Published: (2017) -
NSGA-II Algorithm for Assembly Line Balancing with Multi-Resource Constraints
by: M. F. F., Ab Rashid, et al.
Published: (2016) -
Evaluation of rank-based crossovers to optimize real-life assembly line balancing with resource constraint
by: K. H., Khalib, et al.
Published: (2019)