Process flow for work breakdown structure in plannning and scheduling : a comparative case study
Developing a work breakdown structure is an important step during the initial phase of the project that once the basic scope have been identified, initial work breakdown structure can be created with a limited scope of information. A work breakdown structure is the basis for planning and managing th...
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/9319/ http://umpir.ump.edu.my/id/eprint/9319/ http://umpir.ump.edu.my/id/eprint/9319/1/NURULZANNA%20BINTI%20IDRIS.PDF |