Process flow for work breakdown structure in plannning and scheduling : a comparative case study

Developing a work breakdown structure is an important step during the initial phase of the project that once the basic scope have been identified, initial work breakdown structure can be created with a limited scope of information. A work breakdown structure is the basis for planning and managing th...

Full description

Bibliographic Details
Main Author: Nurulzanna, Idris
Format: Undergraduates Project Papers
Language:English
Published: 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/9319/
http://umpir.ump.edu.my/id/eprint/9319/
http://umpir.ump.edu.my/id/eprint/9319/1/NURULZANNA%20BINTI%20IDRIS.PDF
id ump-9319
recordtype eprints
spelling ump-93192015-10-07T00:25:19Z http://umpir.ump.edu.my/id/eprint/9319/ Process flow for work breakdown structure in plannning and scheduling : a comparative case study Nurulzanna, Idris TH Building construction Developing a work breakdown structure is an important step during the initial phase of the project that once the basic scope have been identified, initial work breakdown structure can be created with a limited scope of information. A work breakdown structure is the basis for planning and managing the key areas within a project. If work breakdown structure is not designed properly, it can have an impact on the whole project as work breakdown structure serves as the basis of planning. The impact for not proper of the work breakdown structure is not clear work assignments and goals difficult to achieve. Experienced project managers know that there are many things wrong or not right in the project no matter how he managed the planning and execution of their work. Unfortunately for inexperienced planners, they can not anticipate what will happen if they do not prepare properly planning. Proper planning should be done to avoid problems that cannot be expected in the future. If not, many problems will arise, especially during construction. Thus, planner must understand and know how to develop a work breakdown structure correctly. For inexperienced planners, there may be some problems in the planning process. In general, an inexperienced planner has problems in the initial stage. He could not identify which one should be done first. Therefore, this study was come out to study the process flow of work breakdown structure during the planning stage. The objectives of this study are to define the process flow of work breakdown structure based on case study, to identify the similarity on process flow of work breakdown structure among case study and to suggest the suitable process flow of work breakdown structure that can be use for inexperienced planner. In this study, data collection is carried out by interviews. Three of the contractors involved in the planning process will be selected, for this case study. Then, an interview with three project managers will be conducted. As a result, three case studies has similar process flow but different in the sequence only. Difference sequence based on their experience factor. This research hopes to contribute to the planning of inexperience, especially in developing work breakdown structure in the right way. 2014-01 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/9319/1/NURULZANNA%20BINTI%20IDRIS.PDF Nurulzanna, Idris (2014) Process flow for work breakdown structure in plannning and scheduling : a comparative case study. Faculty Of Civil Engineering & Earth Resources, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:84925&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TH Building construction
spellingShingle TH Building construction
Nurulzanna, Idris
Process flow for work breakdown structure in plannning and scheduling : a comparative case study
description Developing a work breakdown structure is an important step during the initial phase of the project that once the basic scope have been identified, initial work breakdown structure can be created with a limited scope of information. A work breakdown structure is the basis for planning and managing the key areas within a project. If work breakdown structure is not designed properly, it can have an impact on the whole project as work breakdown structure serves as the basis of planning. The impact for not proper of the work breakdown structure is not clear work assignments and goals difficult to achieve. Experienced project managers know that there are many things wrong or not right in the project no matter how he managed the planning and execution of their work. Unfortunately for inexperienced planners, they can not anticipate what will happen if they do not prepare properly planning. Proper planning should be done to avoid problems that cannot be expected in the future. If not, many problems will arise, especially during construction. Thus, planner must understand and know how to develop a work breakdown structure correctly. For inexperienced planners, there may be some problems in the planning process. In general, an inexperienced planner has problems in the initial stage. He could not identify which one should be done first. Therefore, this study was come out to study the process flow of work breakdown structure during the planning stage. The objectives of this study are to define the process flow of work breakdown structure based on case study, to identify the similarity on process flow of work breakdown structure among case study and to suggest the suitable process flow of work breakdown structure that can be use for inexperienced planner. In this study, data collection is carried out by interviews. Three of the contractors involved in the planning process will be selected, for this case study. Then, an interview with three project managers will be conducted. As a result, three case studies has similar process flow but different in the sequence only. Difference sequence based on their experience factor. This research hopes to contribute to the planning of inexperience, especially in developing work breakdown structure in the right way.
format Undergraduates Project Papers
author Nurulzanna, Idris
author_facet Nurulzanna, Idris
author_sort Nurulzanna, Idris
title Process flow for work breakdown structure in plannning and scheduling : a comparative case study
title_short Process flow for work breakdown structure in plannning and scheduling : a comparative case study
title_full Process flow for work breakdown structure in plannning and scheduling : a comparative case study
title_fullStr Process flow for work breakdown structure in plannning and scheduling : a comparative case study
title_full_unstemmed Process flow for work breakdown structure in plannning and scheduling : a comparative case study
title_sort process flow for work breakdown structure in plannning and scheduling : a comparative case study
publishDate 2014
url http://umpir.ump.edu.my/id/eprint/9319/
http://umpir.ump.edu.my/id/eprint/9319/
http://umpir.ump.edu.my/id/eprint/9319/1/NURULZANNA%20BINTI%20IDRIS.PDF
first_indexed 2023-09-18T22:07:46Z
last_indexed 2023-09-18T22:07:46Z
_version_ 1777414823433207808