Process flow for work breakdown structure in plannning and scheduling : a comparative case study
Developing a work breakdown structure is an important step during the initial phase of the project that once the basic scope have been identified, initial work breakdown structure can be created with a limited scope of information. A work breakdown structure is the basis for planning and managing th...
Main Author: | Nurulzanna, Idris |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/9319/ http://umpir.ump.edu.my/id/eprint/9319/ http://umpir.ump.edu.my/id/eprint/9319/1/NURULZANNA%20BINTI%20IDRIS.PDF |
Similar Items
-
Comparative study in construction scheduling by using primavera P6 and microsoft project
by: Nor Farahin, Baharudin
Published: (2014) -
Planning & scheduling for construction project: a case study of duration estimation & influence factors
by: Nor Hashimah, Mohd Fuzi
Published: (2014) -
Work process in building construction : a case study of Kelantan Trade Center (KTC)
by: Mohd Afnan, Abdullah
Published: (2006) -
Construction planning and scheduling a case study of "Cadangan membina dan menyiapkan Kulliyyah Sains untuk Universiti Islam Antarabangsa Malaysia
by: Mohd Khalild, Abdul Kadir
Published: (2006) -
Malaysian labour productivity for reinforced concrete structural frame: a case study
by: Ali, Maisarah, et al.
Published: (2012)